Seoul Outer Circular Road


Project Name



Seoul Outer Circular Road Construction (Section 11, 12, 13)



Project Period





- 11th Section- Jul 10 1995~Dec 10 1999
- 12th Section May 19 1992~Dec 12 1995
- 13th Section: Jun 20 1994~Jul 27 1998
Description
- 11th
        Section: Total Extension: L=4,147 km,
   B=37.8m Bridge (8-lane) 3 Major Bridges   (1285km) Two-way Tunnel (434m)
- 12th
  Section: Total Extension=2,360km B=37.8m
  (8-lane) Bucheon Elevated Bridge (2.29km)
- 13th
  Section: Total Extension L=1,950km,
  B=37.8m (8-lane), Bucheon Elevated Bridge  
   (1.95km) Songnae Interchange (1.28km)